Concept & data contract
Lock load units, SKU/order profile, peak window, destinations and unknown fields that require sensitivity tests.
Bastian Solutions organizes conveying, sortation and palletizing decisions around named owners, testable assumptions and lifecycle gates. Planning references in brand configuration—such as a 1964 seed year or 1,000+ headcount—are generated-range values and must not be published as verified corporate facts without source review.
Commands, confirmations, timeouts and restart authority are assigned before steel drawings freeze. The matrix separates detection from authorization.
| Boundary | Detects | Confirms | May restart |
|---|---|---|---|
| WMS ↔ WCS | Order wave / mission request | Mission accepted with destination set | WCS supervisor with WMS reconciliation |
| WCS ↔ PLC | Lane not ready / merge blocked | Photo-eye and interlock state | Controls engineer or named operator role |
| PLC ↔ Equipment | Jam, E-stop, motor fault | Local HMI status word | Maintenance after lockout clearance |
| Palletizer cell | Pattern incomplete / robot fault | Cell controller handshake | Cell owner under safety procedure |
Lock load units, SKU/order profile, peak window, destinations and unknown fields that require sensitivity tests.
Exercise divert timing, blocked chutes and lost confirms against PLC or WCS under a versioned signal dictionary.
Prove integrated software and equipment behavior under controlled conditions with agreed disturbance cases.
Validate installed geometry, actual loads, buffer starts and recovery procedures; close open items before ownership transfer.
Application, integration and documentation support are provided by project scope. The configuration lists 54 countries as a planning reference and a service network description of application, integration and documentation support—neither is a universal SLA nor a resident-service commitment.
Product SKU planning reference of 2,500+ describes catalog breadth for RFQ conversations, not an inventory commitment at every site.
Rate, accumulation, divert density and pallet-pattern reviews against the operating profile.
Interface matrices, emulation cases and FAT protocols for WMS/WCS/PLC boundaries.
Brownfield cutover plans with fallback divert paths and rollback triggers.
Isolation sequences, critical spares lists and jam-recovery procedures at handover.
Cartons/hour or lines/hour with SKU mix, peak duration and accumulation assumptions stated.
Boundary: scenario-specificIntegrated software/equipment behavior under controlled loads and planned disturbances.
Evidence: signed protocolInstalled end-to-end flow with site geometry, actual loads and recovery observation.
Evidence: open-item registerIsolation, spares and restart ownership documented before operational handover.
Evidence: handover pack